BS EN 60947-6-1:2005+A1:2014
Low-voltage switchgear and controlgear Multiple function equipment. Transfer switching equipment
| Označení normy: | BS EN 60947-6-1:2005+A1:2014 | 
| Počet stran: | 50 | 
| Vydáno: | 2014-07-31 | 
| ISBN: | 978 0 580 77522 2 | 
| Status: | Standard | 
BS EN 60947-6-1:2005+A1:2014
This standard BS EN 60947-6-1:2005+A1:2014 Low-voltage switchgear and controlgear is classified in these ICS categories:
- 29.120.40 Switches
- 29.130.20 Low voltage switchgear and controlgear
This part of IEC 60947 applies to transfer switching equipment (TSE) to be used in power systems for transferring a load supply between a normal and an alternate source with a supply interruption during transfer, the rated voltage of which does not exceed 1 000 V a.c. or 1 500 V d.c.
It covers:
- manually operated transfer switching equipment (MTSE); 
- remotely operated transfer switching equipment (RTSE); 
- automatic transfer switching equipment (ATSE). 
It covers TSE provided with or without an enclosure.
Devices necessary for the control (e.g. control switches, etc.) and the protection (e.g. circuit-breakers, etc.) of a TSE are covered by the relevant IEC standards.
Note 1 TSE used only for emergency lighting may be subject to specific rules and/or legal requirements and are not, therefore, covered by this standard.
The object of this part of IEC 60947 is to state:
- The characteristics of the equipment. - Text deleted 
- The conditions of the equipment with respect to: - operation for which the equipment is intended; 
- operation and behaviour in case of specified abnormal conditions, for example, short-circuit; 
- dielectric properties. 
 
- The tests intended to confirm that these conditions have been met and the methods for performing these tests. 
- The data to be marked on the equipment and provided by the manufacturer. 
NOTE 2 This standard covers also ATSE or RTSE which can be used for safety services as defined in IEC 60364-1 and for which the installation requirements are given by IEC 60364-5-56.
NOTE 3 Other ATSE requirements are under consideration such as closed transition TSE (make before break transfer operation).
