Homepage>IEC 61850-7-410:2012+AMD1:2015 CSV - Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
sklademVydáno: 2015-11-12

IEC 61850-7-410:2012+AMD1:2015 CSV

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

Réseaux et systèmes de communication pour l'automatisation des systèmes électriques - Partie 7-410: Structure de communication de base - Centrales hydroélectriques - Communication pour le contrôle-commande

Format
Availability
Price and currency
Anglicky/Francouzsky Hardcopy
skladem
937.42 €
Anglicky/Francouzsky PDF
Immediate download
937.42 €
Označení normy:IEC 61850-7-410:2012+AMD1:2015 CSV
Vydáno:2015-11-12
Edice:2.1
ICS:33.200
DESCRIPTION

IEC 61850-7-410:2012+AMD1:2015 CSV

IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. This consolidated version consists of the second edition (2012) and its amendment 1 (2015). Therefore, no need to order amendment in addition to this publication.