Cena s DPH / bez DPH
>25/30501130 DC Draft BS EN 18213-1 District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks Part 1: Qualification testing of fitter
sklademVydáno: 2025-10-10
25/30501130 DC Draft BS EN 18213-1 District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks Part 1: Qualification testing of fitter

25/30501130 DC

Draft BS EN 18213-1 District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks Part 1: Qualification testing of fitter

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
Netisknutelné
540 Kč
Anglicky Tisk
Skladem
540 Kč
Označení normy:25/30501130 DC
Počet stran:32
Vydáno:2025-10-10
Status:Draft for Comment
Popis

25/30501130 DC


This standard 25/30501130 DC Draft BS EN 18213-1 District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks is classified in these ICS categories:
  • 23.040.07 Pipelines and its parts for district heat
  • 23.040.99 Other pipeline components
This document specifies the methods of examining the knowledge and skill set of the fitter required to carry out on-site joint casing connections on thermally insulated single and twin pipe systems for directly buried hot and cold water networks according to .The application of these specified methods specifications ensures that the examination is carried out according to a standardised examining procedure.This document covers the following processes: - preparatory works for joint casing assembly; - assembling and testing the elements for surveillance systems; For special surveillance systems it can be important to have additional training.preparing work for joint casing system installation; - assembling sealable joint casing system; - verifying joint tightness (leakage testing); - thermally insulating the joint casing ( PUR foaming or half-shells); - sealing fill & vent openings (weldable or sealable plugs); - assessing overall installation quality of the completed joint connection (non-destructive).