Cena s DPH / bez DPH
Hlavní stránka>ASTM F1675-13R22 - Standard Practice for Life-Cycle Cost Analysis of Plastic Pipe Used for Culverts, Storm Sewers, and Other Buried Conduits
Vydáno: 01.02.2022

ASTM F1675-13R22

Standard Practice for Life-Cycle Cost Analysis of Plastic Pipe Used for Culverts, Storm Sewers, and Other Buried Conduits

Formát
Dostupnost
Cena a měna
Anglicky PDF
K okamžitému stažení
1291 Kč
Anglicky Tisk
Skladem
1291 Kč
Označení normy:ASTM F1675-13R22
Vydáno:01.02.2022
Status:Active
Počet stran:4
Sekce:08.04
Označení:cost analysis; discount rate; drainage system; engineering economics; least cost; life-cycle cost; material service life; present value analysis; project design life;
Popis

1.1 This practice establishes a procedure for using life cycle cost (LCC) analysis techniques to evaluate alternative drainage system designs, using plastic pipe that satisfy the same functional requirements.

1.2 The LCC technique measures the present value of all relevant costs to install, operate, and maintain alternative drainage systems such as engineering, construction, maintenance, rehabilitation, or replacement over a specified period of time. The practice also accommodates any remaining residual or salvage value.

1.3 The decision maker, using the results of the LCC analysis, can then identify the alternative(s) with the lowest estimated total cost based on the present value of all costs.

1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.