Cena s DPH / bez DPH
Hlavní stránka>ASTM E2168-10R16 - Standard Classification for Allowance, Contingency, and Reserve Sums in Building Construction Estimating
Not available online - contact us!
Vydáno: 01.05.2016

E2168-10R16

Standard Classification for Allowance, Contingency, and Reserve Sums in Building Construction Estimating

Měna
1 155 Kč
Označení normy:E2168-10R16
Vydáno:01.05.2016
Status:Active
Počet stran:8
Sekce:04.12
Označení:allowance; budgeting; building economics; classification; construction estimating; contingency; cost control; cost estimating; cost planning; cost risk; reserve; UNIFORMAT II;
Popis

1.1 This classification establishes a classification for allowance, contingency, and reserve sums used in construction, project, and program estimating.

1.2 This classification applies to all construction work.

1.3 This classification is not based on permanent physical elements of construction (as defined and classified in Classification E1557). Rather, the classification items are cost components common to construction, project, and program estimates.