Cena s DPH / bez DPH
Hlavní stránka>BS EN 50549-10:2022 Requirements for generating plants to be connected in parallel with distribution networks Tests for conformity assessment of generating units
sklademVydáno: 2022-11-17
BS EN 50549-10:2022 Requirements for generating plants to be connected in parallel with distribution networks Tests for conformity assessment of generating units

BS EN 50549-10:2022

Requirements for generating plants to be connected in parallel with distribution networks Tests for conformity assessment of generating units

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
11220 Kč
Anglicky Tisk
Skladem
11220 Kč
Označení normy:BS EN 50549-10:2022
Počet stran:172
Vydáno:2022-11-17
ISBN:978 0 539 16222 6
Status:Standard
Popis

BS EN 50549-10:2022


This standard BS EN 50549-10:2022 Requirements for generating plants to be connected in parallel with distribution networks is classified in these ICS categories:
  • 29.160.20 Generators
The purpose of this document is to provide technical guidance for tests on generating units and interface protection to evaluate their electrical characteristics. NOTE 1 Mechanical issues are taken into account as far as they influence the electrical characteristics. The evaluation results are intended to be used to demonstrate conformity of generating units to technical requirements for grid connection. In this context the evaluation results can also be used as part of a certification programme. NOTE 2 Besides the type test results of the generating unit all additional elements for connection to the grid (e.g. transformer, cabling, multiple units) are considered in the evaluation of the final installation of a generating plant. The requirements to be evaluated are covered in the following standardization documents: – EN 50549 1:2019: Requirements for generating plants to be connected in parallel with distribution networks - Part 1: connection to a LV distribution network - Generating plants up to and including Type B – EN 50549 2:2019: Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network - Generating plants up to and including Type B If grid connection requirements are dealt with in other documents or for other generating module types, where no specific testing procedure is provided, testing methods of this document can be used if applicable. This document provides evaluation criteria for the conformity assessment of generating units with respect to the abovementioned standardization documents, based on type testing. However, some requirements are applicable on the generating plant level. The assessment of the conformity to these plant requirements are out of the scope of this document. Nevertheless, this document may be used to show the capabilities of a generating unit to be used in a plant. As a consequence, it is possible that the conformity assessment of a generating unit does not cover all aspects of the above-mentioned standardization documents, typically when a requirement is evaluated on a plant level. Therefore, the conformity assessment report indicates clearly which clauses of this document are covered and which clauses are not covered. This document recognizes the existence of specific technical test requirements within several member states that must be complied with.