Cena s DPH / bez DPH
>UNE HD 60364-8-2:2020 - Low-voltage electrical installations - Part 8-2: Prosumer's low-voltage electrical installations
sklademVydáno: 2020-06-03
UNE HD 60364-8-2:2020 - Low-voltage electrical installations - Part 8-2: Prosumer's low-voltage electrical installations

UNE HD 60364-8-2:2020

Low-voltage electrical installations - Part 8-2: Prosumer's low-voltage electrical installations

Instalaciones eléctricas de baja tensión. Parte 8-2: Instalaciones eléctricas de baja tensión de prosumidores.

Formát
Dostupnost
Cena a měna
Anglicky PDF
K okamžitému stažení
Tisknutelné
3151 Kč
Anglicky Tisk
Skladem
3151 Kč
Španělsky PDF
K okamžitému stažení
Tisknutelné
3151 Kč
Španělsky Tisk
Skladem
3151 Kč
Označení normy:UNE HD 60364-8-2:2020
Počet stran:56
Vydáno:2020-06-03
Status:Norma
Počet stran (Španělsky):58
Popis

UNE HD 60364-8-2:2020

This part of IEC 60364 provides additional requirements, measures and recommendations for design, erection and verification of all types of low-voltage electrical installation according to Clause 11 of IEC 60364-1:2005 including local production and storage of energy in order to ensure the compatibility with the existing and future ways to deliver the electrical energy to current-using equipment or to the public network by means of local sources. Such electrical installations are equipped with a local Electrical Energy Management System (EEMS) and are designated as Prosumer s Electrical Installations (PEI). This document also provides requirements for proper behavior and actions of PEI in order to efficiently obtain sustainable and safe operations of it when integrated into smart grids. These requirements and recommendations apply, within the scope of the IEC 60364 series, for new installations and modification of existing installations. NOTE Electrical sources for safety services including associated electrical installations and standby electrical supply systems for a secure continuity of supply, which are operated only occasionally and for short periods (e.g. monthly 1 hour) in parallel with the distribution grid for testing purposes, are outside the scope of this part.

: